EllaLink: all aboard
- María José López Pourailly
- Últimas Noticias 2020
In early November 2020 EllaLink started the loading operations, onboard the vessel Ile de Bréhat, of the submarine cable that will enable direct long-term interconnectivity between Europe and Latin America to meet the needs of the R&E communities in both continents, thanks to the EU-funded BELLA Programme. CONNECT (GÉANT’s on-line magazine) spoke with EllaLink to learn more about the loading process and the effects of the pandemic on this specific operation.