The BELLA Programme uses cookies to deliver the best possible web experience.

By continuing to use this site, you agree that we may store and access cookies on your device. Please ensure you have read the Cookies Policy. Learn more

I understand

BELLA's terrestrial phase has its first router already installed

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active
 

February 24, 2021: RedCLARA’s Technical Manager, Marco Teixeira, visiting the Equinix-São Paulo datacenter (Brazil), carried out the installation of the first router equipment for BELLA-T.

The new equipment became part of the RedCLARA backbone, and its function will be to connect the Brazilian academic network, RNP, at a higher capacity and connect the links that go to Argentina and Chile.

According to Marco Teixeira, “this change will allow us to receive 100G links and represents a gigantic increase in routing capacity. Just to have an idea of ​​the capacity, today the router in operation has 120G per second installed and the new one is 2.4Tbps per second; an increase of 1900% if we look at the current one”.

The equipment that comes to contribute to the land phase of the BELLA Programme, which considers the improvement of the South American optical backbone of RedCLARA, is not yet in use, but since its installation has already been carried out, service migrations will soon begin.

ACKNOWLEDGEMENTS

BELLA receives funding from the European Union through the Horizon 2020 program under grant agreement number 731505 - DG CNECT (BELLA-S1); DG DEVCO, under number LA / 2016 / 376-534 (BELLA-T), and DG DEFIS.

Contact

For more information about BELLA please contact:

Europe: info@geant.org

Latin America: redclara_comunica@redclara.net

© Copyright 2017 . All Rights Reserved